If you are expecting to extend the underfloor heating system in the building at a future date, extra manifold ports will be needed for the additional zone(s). The project manager dealing with your project can incorporate this into your quote, saving cost and disruption when the future zone(s) are eventually added.



You will probably need to lay some distribution pipes to the future zone(s) through existing floors and walls, so some extra provision of distribution pipe will be needed. The distribution pipe should be run out to a position near the future zone and back to the manifold without cutting it at the farthest point.