01404 549770 Get a free quote

We would usually expect to have a manifold per floor – as each length of pipework goes out from and back to the manifold, this is the most logical way of installing to avoid lots of pipe runs up and down walls. Manifolds are best sited as central as possible to the zones they are feeding, to avoid lots of congestion through doorways and hallways. We can advise you on this and discuss the best options with you right form a quote stage – so you can be considering this for your project schedule and works.